by admininstatecquia | 28/Sep/2022 | Projects
At Simatec we have designed and executed the installation of a direct pumping system with solar panels to supply electricity to the red fruit farm, replacing the conventional diesel system. To do this, we have installed 30 kW of solar panels and complete automation of...
by admininstatecquia | 28/Sep/2022 | Projects
Installation of equipment for Sanitary hot water and channeling of the same in Islantilla in the facilities of the School of Hospitality. Hot water accumulators and a boiler have been installed along with all the necessary hot water piping in the complex of the School...
by admininstatecquia | 6/Jul/2022 | Projects
At Simatec we have carried out a 280 kw industrial self-consumption installation for a client in Lepe.
by admininstatecquia | 31/May/2022 | Projects
Project carried out in Cabezas Rubias (Huelva) in 2021 and completed in 2022. This installation was carried out for a private client who needed a medium voltage power...
by admininstatecquia | 23/Jan/2022 | Projects
Solar pumping by means of an irrigation installation in Moguer. A new installation carried out these days for a Moguer company dedicated to cultivation. An installation of solar panels to produce Clean Electric Energy at zero cost. An isolated and totally independent...
by admininstatecquia | 22/Jan/2022 | Projects
At Simatec we incorporate the innovative Isifloating system into our facilities, a system for installing solar panels on rafts or reservoirs with multiple advantages, greater performance of the installations, without generating an environmental impact, an 80%...