by admininstatecquia | 23/Jan/2022 | Projects
Solar pumping by means of an irrigation installation in Moguer. A new installation carried out these days for a Moguer company dedicated to cultivation. An installation of solar panels to produce Clean Electric Energy at zero cost. An isolated and totally independent...
by admininstatecquia | 22/Jan/2022 | Projects
At Simatec we incorporate the innovative Isifloating system into our facilities, a system for installing solar panels on rafts or reservoirs with multiple advantages, greater performance of the installations, without generating an environmental impact, an 80%...
by admininstatecquia | 22/Jan/2022 | Projects
At Simatec we have designed and installed a solar plant for self-consumption – net balance of 25 kW. The plant has been designed to provide our client with 100% of the daytime loads and discharge of the surplus to the network with a 4-year amortization and an...
by admininstatecquia | 22/Jan/2022 | Projects
Complete electrical installation of the Sánchez de la Campa Fish and Seafood warehouse in the town of Huelva.
by admininstatecquia | 7/Dec/2021 | Legislation, Projects
At Simatec we have designed and executed this hybrid photovoltaic solar energy project for self-consumption in the town of Pilas (Seville). To do this, we have used 14 400wp monocrystalline Jinko solar panels and a Fronius inverter and monitoring, achieving up to 70%...